In the Pioneering Area of the 2013 national jamboree, we put together a couple of Single A-Frame Bridge kits, so Scouts and Venturers could build this simple crossing bridge during their visit to Garden Ground Mountain. Each kit included:
- two pre-constructed walkways
- two 12-foot leg spars (shear legs)
- one 5-foot transom spar
- one 6-foot ledger spar
- two pre-positioned anchors
- four pioneering stakes
- two guylines
- five lashing ropes
Whenever a crew wanted to build a bridge, we provided an overview of the design and gave them a quick introduction to tying a rope tackle and the Japanese Mark II Square Lashing. What follows are some photo montages of the Single A-Frame bridges built from the kits during the jamboree. For larger and largest views, click on the photos once, and then once again:
On occasion, a pair of Scouts wanted to build a bridge, and with persistence, and the help of staff or friendly Scouter, they were able to get it done.
JAMBOREE PIONEERING AREA: BRIDGES
JAMBOREE PIONEERING AREA: MAIN PAGE
Related article
- Single A-Frame Bridge (scoutpioneering.com)